LOYOLA COLLEGE (AUTONOMOUS), CHENNAI – 600 034
B.Com. DEGREE EXAMINATION – COMMERCE
|
FOURTH SEMESTER – APRIL 2007
CS 4203 – PROJECT METRICS
Date & Time: 19/04/2007 / 9:00 – 12:00 Dept. No. Max. : 100 Marks
PART – A
Answer all Questions 10 X 2 = 20
- What is a project?
- What are the activities included in allocating resources?
- What the two types of strategic assignments?
- When Planning should be done in a project?
- What are the possibilities of occurrence of risk in a project?
- What are the schedules included in allocating resources?
- What is meant by assessing progress?
- Define contract.
- What is meant by BS 6079?
- Define Risk management.
PART – B
Answer all Questions 5 X 8 = 40
- a) Discuss in detail about the information flow and control in an organization.
(or)
- b) Explain the steps included in analysing of characteristic of a project.
- a) Explain Cash flow forecasting in detail.
(or)
- b) What are the objectives of planning activity?
- a) Define the following:
(i) Most likely time (ii) Optimistic time (iii) Pessimistic time
(or)
- b) List the various types of cost and explain.
- a) Discuss about the Time and material contract and its disadvantage.
(or)
- b) What are the steps included in change control procedure?
- a) Explain the factors that are taken for project control in British standard.
(or)
- b) Discuss about the planning process of BS 6079.
PART – C
Answer any two Questions 2 X 20 = 40
- a) Discuss in detail about the project control life cycle. (10 marks)
- b) Explain in detail about the cost-benefit evaluation techniques. (10 marks)
- a) Explain Barry Boehm risk engineering. (10 marks)
- b) List the categories of resources and explain. (10 marks)
- a) Explain BS 6079 Project lifecycle in detail. (10 marks)
- b) Explain the factors that are considered for risk identification. (10 marks)