CS 4205 – PROJECT METRICS
Date : 19-04-2012 Dept. No. Max. : 100 Marks
Time : 1:00 – 4:00
SECTION – A
Answer all the questions: ( 10 X 2 = 20 )
- Define project planning
- What is scheduling in project development?
- What are strategic assignments?
- What are the factors influencing the software cost?
- Define contact.
- What are the types of software products?
- What are the types of resources allocated to a project?
- What is walkthrough?
- What do you meant by CMMI?
- What is risk mitigation plan?
SECTION – B
Answer all the questions ( 5 X 8 = 40 )
- a) Explain control flow and information flow in development of a system
(OR)
- b) Explain the following documents in software development
- i) System Definition ii)Project Plan
- a) Explain Delphi cost estimation Model
(OR)
- b) Explain cash flow forecasting in detail
- a) Explain the types of software team according to the modes of communication
(OR)
- b) Write down the features influences the software quality
- a) Write down the steps involved in change control procedure.
(OR)
- b) Explain the contents of SRS document
- a) What are the types of risks?
(OR)
- b) Explain risk matrix in risk planning and remedial action.
SECTION – C
Answer any TWO questions: ( 2 X 20 = 40 )
- a) Explain project control life cycle in detail
- b) Explain Expert Judgement and how it differs from COCOMO in Cost estimation
- a) Explain spiral model and waterfalls model in product engineering.
- b) Explain quality management in product and process
- a) Explain the steps followed in risk identification
- b) Explain product standards used in software quality metrics.