Loyola College B.Sc. Computer Science April 2012 Operations Research Question Paper PDF Download

LOYOLA COLLEGE (AUTONOMOUS), CHENNAI – 600 034

B.Sc. DEGREE EXAMINATION – COMPUTER SCIENCE

FIFTH SEMESTER – APRIL 2012

CS 5402/5503 – OPERATIONS RESEARCH

 

 

Date : 27-04-2012              Dept. No.                                        Max. : 100 Marks

Time : 1:00 – 4:00

 

PART-A

Answer ALL questions:                                                                                                               10 X 2=20

  1. Write a General form of LPP.
  2. What is optimal solution?
  3. Why we should prefer dual problem to solve LPP?
  4. Define traveling salesman problem.
  5. List out the methods of solving Transportation problem.
  6. Define Activity & Node
  7. What is a sequencing problem?
  8. What is setup cost?
  9. What is reordering level?
  10. When replacement is made?

 

PART-B

Answer All questions:                                                                                                                   5 X 8=40

 

11 a) ) A Company produces refrigerators in unit I and heaters in unit II. The two

products are produced and sold in a weekly basis. Weekly production cannot

exceed 25 in unit I and 36 in unit II. Formulate this problem as an LP model

(OR)

 

11 b Solve the following l.p.p  graphically.

Max  Z = 10 x1 +15x2

Subject to            2 x1 +x2     ≤ 26

2 x1 +4x2     ≤ 56

– x1 +x2     ≤ 5

                                                                                        x1 ,x2 ≥0

 

12 a) Construct  the dual to the primal problem

Minimum Z =  x1 +x2 +x3

Subject to         x1 –3x+4 x3      = 5

x1 -2x2       ≤   3

2 x2 – x3    ≥  4

                                                        x1 ,x2 ≥0 x3  unrestricted in sign.

 

 

(OR)

 

12 b) Obtain the initial solution of the following transportation problem by the north-west corner rule and matrix minima given that (i) the requirements are 40, 90 and 100 units and (ii) the supply are 90, 70  and 70.

 

  Source
Destination S1 S2 S3
D1 15 28 27
D2 24 24 25
D3 22 25 20

 

13 a) A department has five employees with  five jobs to be performed . From past records, the time (in hours) that each man take to do each job is known and given in the table

 

 

Employee
 

 

Jobs

I II III IV V
A 10 5 13 15 16
B 3 9 18 13 6
C 10 7 2 2 2
D 7 11 9 7 12
E 7 9 10 4 12

How should the jobs be allotted on per employee, so as to minimize the total number of hours

(OR)

13 b) Find the sequence that minimizes the total elapsed time required to complete the following tasks on two machines

 

Task           : A       B         C         D         E          F          G         H         I

Machine I  : 2        5          4          9          6          8          7          5          4

Machine II            : 6        8          7          4          3          9          3          8          11

 

 

 

14 a) A project consists of a series of activities called A,B,..,I with the following relationship<X,Y means X and Y cannot start until W is completed with this notation construct a network diagram having the following constraints.

A<D,E;  B,D<F;   C<G;   B<H;   F,G<I;

Time:     A       B         C         D         E          F          G         H         I

Activity:23      8          20        16        24        18        19        4          10

.

(OR)

14 b )  (i) Write down the difference between PERT & CPM.   (4)

(ii) Define the following terms:

a)dummy activity         b) total float                        .

 

15a)   Manufacture has to supply 600 units of his product/year. Shortages are not allowed and storage cost amounts to Rs.0.60/unit/year.The set up cost/run is Rs.80.Determine(i) optimum run size (ii) the minimum average yearly cost.

 

(OR)

 

15 b) The annual demand for an item is 3200 units. The unit cost is Rs. 6/- and

inventory carrying charges 25% per annum. If the cost of one procurement is

Rs. 150/- determine (i) Economic order quality (ii) time between two

consecutive orders   (iii) number of order per year (iv) the optimal total cost

PART-C

Answer any TWO                                                                             2 X 20=40

16 a) Use simplex method to solve the following L.P.P

Maximize  Z =  x1 +2x2+x3

Subject to        2 x1 +x2 – x3    ≤ 2

-2 x1 +x2 -5x3     ≥-6

4 x1 +x2 +x3    ≤ 6

                                                                                        x1 ,x2 ,x3≥0

 

  1. b) Determine an initial basic feasible solution to the following transportation problem

by using (a) North west corner rule (b) Least cost method(c)Vogel’s

approximation.

 

Destination
 

 

Source

D1 D2 D3 D4 Supply
S1 21 16 15 3 11
S2 17 18 14 23 13
S3 32 27 18 41 19
 

Demand

 

6

 

10

 

12

 

15

 

 

17 a) Find the sequence that minimizes the total time required in performing the following    job on three machines in order ABC .A processing time (in hours) are given in the      following table.

Jobs     :1         2          3          4          5

Machine A      :8         10        6          7          11

Machine B       :5         6          2          3          4

Machine C       :4         9          8          6          5

 

 

 

  1. b) The project has the following time schedules.
Activity 1-2 1-6 2-3 2-4 3-5 4-5 6-7 5-8 7-8
t0 3 2 6 2 5 3 3 1 4
tm 6 5 12 5 11 6 9 4 19
tp 15 14 30 8 17 15 27 7 28
  1. Draw the Project Network
  2. Find the critical path.

.

 

18 a) A stockiest has to supply 12,000 units of a product per year to his customer. The

demand is fixed and known and the shortage cost is assumed is to be infinite. The

inventory holding cost is Re.0.20 per unit per month and the ordering cost per order

is Rs.350. Determine the following

(i) The optimum lot size q0

(ii) Optimum scheduling period t0

(iii) Minimum total variable yearly cost.

 

 

  1. b) )  Given the following data:
Job 1 2 3 4 5 6
Machine A 12 10 9 14 7 9
Machine B 7 6 6 5 4 4
Machine C 6 5 6 4 2 4

 

Order of Processing : ACB

Determine the optimal sequence & the total elapsed time associated with it.

 